| China Tungsten High-Tech ↗ | China | Operating | Operating portfolio includes Shizhuyuan and Far Vision Tungsten. | Far Vision Tungsten entered the listed-company portfolio in 2025. | 2025 |
Details
- Main mine assets
- The portfolio includes Shizhuyuan and Far Vision Tungsten. The company describes Shizhuyuan as the world's largest single operating tungsten mine.
- Latest ownership change
- Far Vision Tungsten entered the listed-company portfolio in 2025.
Report2025 annual report ↗
|
| Xiamen Tungsten mines ↗ | China | Operating | Luoyang Yulu, Ninghua Xingluokeng and Duchang Jinding operated in 2025. | Youmaopo is under construction. Its design is 3,200 t a year of concentrate adjusted to 65% WO3. | 2025 report |
Details
- Operating mines
- Luoyang Yulu recovers scheelite from CMOC tailings. Ninghua Xingluokeng and Duchang Jinding are also operating mine businesses.
- Youmaopo project
- Bobai Judian's Youmaopo tungsten-molybdenum mine is under construction. The design uses 660,000 t of ore a year and makes 3,200 t a year of concentrate adjusted to 65% WO3.
- Planned mine life
- The company gives a 22-year service life after construction for Youmaopo.
Report2025 annual report ↗
|
| Zhangyuan Tungsten mines ↗ | China | Operating | Taoxikeng, Xin'anzi and Dayu Shilei operated in 2025. | The company uses its mine concentrate inside its own processing chain and also buys concentrate and APT. | 2025 |
Details
- Mine portfolio
- The company holds six mining licences. Taoxikeng, Xin'anzi and Dayu Shilei were operating in 2025.
- Material route
- All company-mined concentrate is used internally. The processing plants also buy concentrate and APT.
- Tailings
- The Dayu Shilei tailings facility was closed and accepted. Mine tailings moved to underground backfill.
Report2025 annual report ↗
|
| Boguty ↗ | Kazakhstan | Operating | Made 5,008 t of concentrate and 3,255 t of tungsten trioxide | Company design: process 3.3 million t of ore a year | 2025 |
Details
- Owner and operator
- Zhetisu Volframy LLP holds the mine right. Jiaxin owns 97% indirectly; Ever Trillion International Singapore owns 3%.
- Mining right
- Subsoil Use Contract 4608-TPI covers 1.16 km² to a maximum depth of 300 m. It runs from 2 June 2015 to 2 June 2040.
- Background
- Phase I commercial production began in April 2025.
- 2025 production
- 2.80 million t of ore mined; 5,008 t of tungsten concentrate; 3,255 t of tungsten trioxide.
- Customer
- One unnamed customer accounted for all reported 2025 revenue. Tungsten-concentrate revenue was HK$1.063 billion.
- Company design
- Process 3.3–3.8 million t of ore a year. The Phase II plan raises this to 4.95 million t a year.
Reports2025 annual report ↗2025 prospectus ↗
|
| Vostok 2 ↗ | Russia | Operating | Extracted 1,471 t of WO3, 95.6% of the 2024 amount | The regional government said lower ore quality caused the decline. | 2025 |
Details
- Owner and operator
- Primorsky GOK is the mine company. AIR processes the underground scheelite ore into concentrate.
- 2023 record
- 1,770 t WO3 extracted and 1,538 t WO3 reported in concentrate.
- 2025 record
- 1,471 t WO3 extracted, equal to 95.6% of the 2024 amount.
- Latest event
- The Primorsky government said production fell because ore quality declined.
ReportsRussia 2023 State Balance ↗Primorsky 2025 report ↗
|
| Festivalnoye & Pravoumiyskoye ↗ | Russia | Operating | Rusolovo reported 127 t of tungsten in concentrate in 2025 and 65 t in the first half of 2026 | These are tin mines that recover tungsten as a by-product. The company labels the measure “tungsten in concentrate.” | Through Jun 2026 |
Details
- Owner and operator
- Rusolovo, part of Seligdar, operates the two tin mines. Tungsten and copper concentrate are by-products.
- Tungsten series
- 103 t in 2023, 68 t in 2024, 127 t in 2025 and 65 t in the first half of 2026. The company labels the measure “tungsten in concentrate.”
- H1 2026 work
- The division mined 557,000 t of ore and processed 566,000 t, including material passing through X-ray preconcentration.
- Reported reserves
- At 1 January 2026, C1+C2 WO3 reserves were 5,600 t at Festivalnoye and 1,800 t at Pravoumiyskoye.
ReportsTin division ↗H1 2026 update ↗Reserves ↗
|
| Nyakabingo ↗ | Rwanda | Operating | Operator reports 100–110 t of wolframite a month containing 66–70% “Tungsten” | Advanced drilling began in 2026. The 25-year mine licence started in 2015. | May 2026 |
Details
- Owner and operator
- Trinity Metals operates Nyakabingo.
- Background
- The mine has operated since the 1930s. Its 25-year licence began in 2015, and the operator reports more than 1,800 workers.
- Current production
- 100–110 t of wolframite a month containing 66–70% “Tungsten”, using the operator's wording.
- Latest work
- An advanced drilling programme began in 2026 to define deeper mineralisation.
- Separate Rwanda event
- On 25 June 2026, the US Treasury designated Bugambira Mines, Rwinkwavu Mining and Wolfram Mining and Processing because of their ownership or control. Nyakabingo was not one of the named companies.
Reports21 May mine update ↗US Treasury designations ↗
|
| Man-nyon ↗ | North Korea | Historical record | A South Korean government portal gives 2,538 t a year of concentrate at 70% WO3, using a 2004 reference date | Historical mine record; the 2025 figure is a national estimate | Historical record / 2025 national estimate |
Details
- National estimate
- USGS estimates North Korea produced 2,000 t of contained tungsten in 2025.
- Mine record
- A South Korean government portal gives 2,538 t a year of concentrate at 70% WO3 for Man-nyon, with a 2004 reference date.
- Historical capacity
- The same portal gives 4,500 t a year of concentrate at 60% WO3. USGS separately estimates 4,000 t WO3-content capacity.
- Current status
- The mine record uses a 2004 reference date. The 2025 figure is a national estimate.
ReportsNorth Korea Information Portal ↗USGS country page ↗
|
| Mt Carbine ↗ | Australia | Operating | Made 13,050 MTU and sold 14,115 MTU in the June quarter; made 4,588 MTU in July ↗ | A$39 million expansion ↗ is designed to raise crushing capacity from about 1 million to 2 million t a year. Final testing is planned for March 2027. | Through Jul 2026 |
Details
- Owner and operator
- EQ Resources controls 100% through Mt Carbine Quarries. The site combines open-pit mining and reprocessing.
- June quarter material movement
- 1,059,120 t mined, including 254,642 t of ore. Crushing feed was 188,322 t. Gravity-plant feed was 70,349 t at 0.258% WO3, with 68% recovery.
- June quarter production
- 13,050 MTU produced and 14,115 MTU sold.
- Closing ore stocks
- 94,890 t of run-of-mine ore and 9,380,607 t in the low-grade stockpile at 30 June 2026.
- July 2026
- 4,588 MTU produced and 3,682 MTU sold.
- Company expansion
- A$39 million project under construction. It is designed to raise crushing capacity from about 1 million to 2 million t a year. The company expects it to add about 500 t of WO3 output a year. Final testing is planned for March 2027.
Reports28 July quarterly report ↗5 August update ↗Expansion plan ↗
|
| Barruecopardo ↗ | Spain | Operating | Made 15,265 MTU and sold 15,353 MTU in the June quarter; made 9,667 MTU in July ↗ | EQR reported a 10 July notice alleging that parts of the restoration plan's water-management rules had not been followed. Mining continued. | Through Jul 2026 |
Details
- Owner and operator
- EQ Resources owns 100% through Saloro S.L.U. The open-pit mine produces tungsten concentrate.
- June quarter material movement
- 260,963 t of ore mined, 458,504 t crushed and 222,752 t sent to the gravity plant at 0.126% WO3. Recovery was 54%.
- June quarter production
- 15,265 MTU produced and 15,353 MTU sold.
- Closing ore stocks
- 51,072 t of run-of-mine ore and 503,620 t in the low-grade stockpile at 30 June 2026.
- July 2026
- 9,667 MTU produced and 11,074 MTU sold.
- Latest event
- Northern mining continued while the southern pit was drained. Ore from the southern pit returned after an 8 July blast. EQR said it received a 10 July notice alleging that parts of the restoration plan's water-management rules had not been followed.
Reports28 July quarterly report ↗5 August update ↗
|
| Dolphin ↗ | Australia | Stockpile processing | Processed 77,953 t of stockpiled ore, made 21,297 MTU and sold 25,514 MTU | Underground development began. The company expected the first underground ore to reach the mill in the quarter ending Sep 2026. | Jun quarter 2026 |
Details
- Owner and operator
- Group 6 Metals owns 100%. The mine produces scheelite concentrate.
- June quarter 2026
- No ore was mined and 6,205 t of waste was moved. The plant processed 77,953 t of stockpiled ore at an estimated 0.45% WO3, made 21,297 MTU and sold 25,514 MTU.
- Closing ore stock
- About 295,000 t at an estimated 0.26% WO3, containing about 77,000 MTU.
- Plant design
- 400,000 t of ore feed a year and concentrate containing 63% WO3.
- Latest mine status
- The plant was processing stockpiled ore while underground development began. The company expected the first underground ore to reach the mill in the quarter ending September 2026.
- Latest company event
- Trading in Group 6 Metals shares resumed on the Australian Securities Exchange on 30 July 2026.
Reports13 July quarterly report ↗30 July trading notice ↗4 August presentation ↗
|
| Kara ↗ | Australia | Care & maintenance | Geoscience Australia assumed minor production when estimating national output for 2024 | Tasmania's December 2025 prospectus lists the mine on care and maintenance. | Dec 2025 |
Details
- Background
- Kara is a small magnetite and scheelite operation in north-west Tasmania.
- 2024 national estimate
- Geoscience Australia included assumed minor Kara production when it estimated Australian output at more than 1,000 t of contained tungsten.
- Latest status
- Tasmania's December 2025 critical-minerals prospectus lists Kara on care and maintenance.
- Latest government process
- The Tasmanian EPA completed its assessment of a proposed waste-rock-storage extension in July 2025.
ReportsGeoscience Australia ↗Tasmania prospectus ↗EPA assessment ↗
|
| Sangdong ↗ | South Korea | Starting up | Mined 19,700 t of development ore. The plant began processing stockpiled ore and producing concentrate. | First-stage design ↗: process 640,000 t of ore and make about 2,300 t of concentrate a year | Through Jul 2026 |
Details
- Owner and operator
- Almonty owns 100% indirectly through Almonty Korea Tungsten Corporation. Sangdong is an underground mine.
- Latest status
- Development mining produced 19,700 t of ore in the second quarter of 2026. The plant began with lower-grade stockpiled ore to stabilise and blend the process before higher-grade feed. The operator described the stockpile as about two months of Phase I feed.
- Shipment status
- First customer shipment was still pending on 10 August 2026.
- Purchase contract
- Global Tungsten & Powders is contracted to buy about 90% of Phase I concentrate. The amended contract runs for 21 years from first delivery and covers 4.41 million MTU in total.
- Company design
- Phase I: process 640,000 t of ore and make about 2,300 t of concentrate a year. Phase II: 1.2 million t of ore and about 4,600 t of concentrate a year, subject to a later decision.
Reports1 July operating update ↗14 July purchase-contract update ↗
|
| Hemerdon ↗ | United Kingdom | Restart | Building work and preparations to restart the plant | The first stage will process fine material at up to 100 t an hour. Full start-up is planned for the first quarter of 2027. | 8 Jul 2026 update |
Details
- Owner and operator
- Tungsten West describes Hemerdon as wholly owned. Drakelands Restoration Ltd holds the current processing and waste permit.
- Background
- Open-pit tungsten and tin mine preparing to restart.
- Latest status
- On 8 July 2026 the company said it planned to begin testing and bringing the plant into operation later that month. Construction and restart preparation were under way.
- Funding
- A US$25 million bridge facility was binding. Documents for a separate facility of up to US$85 million were still being completed.
- Installed and initial rates
- Fines equipment is installed for about 200 t an hour, with initial operation planned at up to 100 t an hour. The first coarse-material configuration is about 150 t an hour.
- Company plan
- Fines and downstream work in the third quarter of 2026, coarse commissioning in the fourth quarter, full start-up in the first quarter of 2027 and a later ramp to 500 t an hour during 2027.
Reports8 July project update ↗Environment Agency permit ↗
|
| Tyrnyauz ↗ | Russia | Study | Confirmatory drilling and mine-economic modelling were under way | Development is planned to start with gold. Tungsten and molybdenum commissioning was provisionally set for 2028. | Mar 2025 |
Details
- Background
- Former tungsten-molybdenum mine being reconsidered as part of a wider mining cluster.
- Latest status
- Confirmatory drilling and mine-economic modelling were under way in March 2025. Development is planned to start with the gold part of the cluster.
- Latest timetable
- Tungsten and molybdenum production or commissioning was provisionally set for 2028.
- Project scale
- The newer plan gives 2.5–3.5 million t of cluster ore a year for the first stage. An older tungsten design used 1.5 million t of ore and 5,385 t WO3 a year.
ReportsRostec project update ↗Russia 2023 report ↗
|
| Sisson ↗ | Canada | Before construction | Updating the feasibility study and carrying out engineering and field work | Earlier design: process 10.5 million t of ore a year for 27 years | 2026 update |
Details
- Owner and operator
- Northcliff Resources owns 88.5% and operates the project. Todd Sisson owns 11.5%.
- Background
- Proposed open-pit tungsten and molybdenum mine. The plan is to make molybdenum concentrate and turn tungsten concentrate into APT.
- Latest status
- Approvals are in place. The company is updating the feasibility study and carrying out engineering and field work before a construction decision.
- July 2026 funding
- A C$7.349 million loan from Todd Sisson refinanced earlier Todd loans.
- Earlier study
- The 2013 design used 10.5 million t of ore a year and a 27-year mine life. The current study is still being prepared.
ReportsCanada project page ↗5 February project update ↗31 July loan update ↗
|
| Panasqueira ↗ | Portugal | Operating | Mined, processed and shipped tungsten concentrate | Plans to raise processing capacity from 600,000 to 800,000 t of ore a year | Q1 2026 |
Details
- Owner and operator
- Almonty owns the mine indirectly through Beralt Tin and Wolfram, which holds the rights and operates it.
- Background
- Underground mine producing tungsten, tin and copper concentrates.
- Latest status
- The mine was mining, processing and shipping tungsten concentrate in the first quarter of 2026. Production was 14.7% lower and shipments were 15.5% lower than a year earlier.
- Company plan
- Raise processing capacity from 600,000 to 800,000 t of ore a year and extend mining to Level 4.
Reports2025 annual information form ↗First-quarter 2026 report ↗
|
| Mittersill ↗ | Austria | Operating | Underground tungsten mine with its own concentrate plant | Sends concentrate to the St. Martin processing plant | Current at 10 Aug 2026 |
Details
- Owner and operator
- Wolfram Bergbau und Hütten operates the mine and processing plant. The company is wholly owned within the Sandvik group.
- Mine
- Underground scheelite mine with an on-site plant that makes tungsten concentrate.
- Product route
- The concentrate goes to Wolfram's St. Martin plant, which makes refined compounds, tungsten powder and tungsten-carbide powder.
ReportsMine page ↗Sandvik ownership record ↗
|
| Nui Phao ↗ | Vietnam | Operating | A large open-pit mine and processing complex producing tungsten, fluorspar, bismuth and copper. Mining moved to the West Pit. | MTC used purchased concentrate during the transition and expected more feed from Nui Phao. | 2025 / quarter ending Jun 2026 |
Details
- Owner and operator
- Masan High-Tech Materials owns Nui Phao Mining Company and the separate MTC refinery. Masan Group reports about 93% economic ownership of Masan High-Tech Materials.
- Background
- Nui Phao is an open-pit mine producing tungsten, fluorspar, bismuth and copper products. MTC is the connected tungsten refinery.
- Mining licence amendment
- The February 2026 amendment expanded the mining area from 90 to 151.8 ha, added western open-pit and eastern underground areas, and mobilised 14,655,040 t of ore for mining through 2031.
- Latest status
- MTC used external concentrate while mining moved to the West Pit. The company expected more feed from Nui Phao and plans more than 8,000 t a year of oxide capacity.
Mine and mill history
Raw ore extracted and ore processed · 2022–2025
Scroll for full table
Reports2025 annual report ↗Second-quarter 2026 report ↗2026 environmental application ↗
|